Exterior Waterproofing
Excavate to the footing, apply membrane and drainage board, then restore grade so water sheds away from the wall.
Source-side membrane when the dig path is realistic on a cut-face lot.
Exterior waterproofing addresses water at the outside foundation face. A responsible scope can cover excavation limits, surface preparation, membrane, drainage board, footing-drain work, backfill, and final grade. On constrained or sloped North Shore lots, access, roots, retaining structures, utilities, and restoration assumptions should be documented before a trench price is compared.
Full details, process, and FAQs →